Total Vertical Stabilizer Logs: 23

Hours Worked: 55.75

VS Complete (Final rivets in VS-1014L/R)

Hours:  .75

May. 28, 2018

Finally got the squeezer set for the AN470AD3 rivets and was able to squeeze all but (3) rivets on each side of the spar caps doublers below the skin to complete the install of the doublers.  Used the 2X gun...

View Details  

VOR Antenna Install and VS Skin Riveting Complete

Hours:  4.75

May. 19, 2018

Finished riveting the skin on.  I did get a few dents on the left side of the skin from the flush set on the 2X gun when using my right hand to run the gun (I’m left handed).  So frustrating...

View Details  

VS Skin Meets VS Skeleton!

Hours:  2.3

May. 17, 2018

Clecoed the VS skeleton to the VS skin and got out the 2x gun, pneumatic squeezer, and the tungsten bucking bar.  I can say that these three tools made this much easier.  The 2x gun is lighter and shorter than...

View Details  

Second Set of Eyes – VS Pre-Closeup (Thanks Josh)

Hours:  1

May. 16, 2018

Loaded the VS skeleton and skin in the truck and rode over to see Josh for a second look before riveting.  Josh thought the work quality was great but did notice that somehow the front spar missed the dimple process! ...

View Details  

Pre-Closeup Checkout

Hours:  1.25

May. 13, 2018

Went through and noticed that the two rivets that go in between the top two hinge brackets somehow got missed.  I took apart a back rivet set and tried to use this to hit the shop head between the hinges...

View Details  

VS skeleton completion and VOR/Camera conduit install.

Hours:  3.9

May. 12, 2018

For the two bad rivets in the skeleton so I took a 12″ long #40 bit and drilled out the bad rivets and re-set them using the same 3x gun with double offset set.  I drilled the bit through a...

View Details  

Rivet VS skeleton together.

Hours:  2.5

May. 09, 2018

Clecoed and riveted the VS skeleton together.  Also installed the VOR antenna doubler I made on the bottom of the top rib.  Two of the rivets I used the double offset set in with the 3x gun came out poorly. ...

View Details  

VS Spar Drill out and replace ALL rivets.

Hours:  2

May. 07, 2018

DRILLED out all the rivets in the VS1008, VS1003 rear spar, and VS1017.  ADDED the VS-1014L&R spar caps into the assembly and re-riveted the entire part back together.  There were 4 slightly enlarged holes when the drilling was done.  The...

View Details  

Riveting VS Begins….Well sort of. One step forward two steps backward.

Hours:  2.1

May. 01, 2018

Got excited to get riveting the VS together.  I missed the line on the plans telling me to assemble the rear spar as seen on page X-X and neglected to put the rear spar caps in-place.  I had an incredibly...

View Details  

VS Skin and Skeleton Primed (P60G2)

Hours:  5.25

Apr. 29, 2018

Today I setup a wet sand table and took the red Scotch Brite and the hose and scuffed all the parts except the skin.  I did not want to use water on the skin as I intend to keep the...

View Details  

Countersunk VS1015 Front Spar Doubler / Match Drill Rudder Stops and VS1010/11/12

Hours:  1

Apr. 28, 2018

Continued countersinking and completed the front spar doubler.  Also match drilled the rudder stops, VS1010, VS1011, and VS1012 rudder hinge brackets.  Used a #12 bit to finish drill the rudder hinge brackets and deburred all the holes. 

View Details  

Countersunk VS-1003 Rear Spar and VS-1014L/R Rear Spar Caps

Hours:  1.5

Apr. 26, 2018

Took my time and checked each and every countersink to make sure they were up to spec.  I took a scrap piece of 025 (same thickness as the skins) and dimpled it to use as a gauge.  The (48) countersunk...

View Details  

VS Skeleton and Skin Deburr Continued

Hours:  1.75

Apr. 24, 2018

After building the rudder with all the protective blue coating removed I thought I decided to keep the coating on the VS skin to see if it lessens the scratches (I also saw an EAA article referencing things NEVER TO...

View Details  

2nd VS-1001 Vertical Stab Skin!

Hours:  2

Apr. 23, 2018

After putting a few dents in the first VS skin I took a  lot more time with the second skin.  I cut even more material from the nose ribs as well.  This time I took the skin and set it...

View Details  

End of MyKitlog.com and start of TimsRV10.com

Hours:  6

Mar. 04, 2018

So after using Kitlog for (2) months I gave up.  The idea is great and the logic on the site is wonderful but twice they program would stop allowing me to uploading to the web with one error or another. ...

View Details  

Match Drill Vertical Stabilizer Skin to Skeleton

Hours:  1.3

Feb. 26, 2018

After reading the beginning of the manual as well as seeing a few other build logs reference trimming the nose ribs in the vertical stabilizer I thought I had done an adequate job trimming and rounding them.  What I can...

View Details  

Countersunk Replacement VS-1008

Hours:  2.25

Feb. 19, 2018

Match drilled and countersunk replacement VS-1008 VS spar doubler.  Also deburred all the adjoining holes that got the drill bit run through them while re-match drilling. Put the VS skeleton back together and ready to add the skin for match...

View Details  

RE-work – Replacement VS-1008 Rear Spar Doubler.

Hours:  1.5

Feb. 18, 2018

Deburred the punched replacement VS-1008 rear spar doubler. When I countersunk the original VS-1008 I used a drill press and a countersink cage. I used a piece of safety wire to stop the cage from spinning while the drill press...

View Details  

Match drill and countersink VS-1008.

Hours:  1.5

Feb. 05, 2018

Spent some time re-assembling the VS, trimmed about 1/8″ off the nose ribs, match drilled, and countersinking the applicable parts.  Pulled the plastic off the inside of the VS skin and ran out of time.

View Details  

VS-1003 Rear Spar and VS-1014 L/R Spar Caps Cont.

Hours:  1.25

Jan. 31, 2018

Un-clecoed and deburred the match drilled holes on the VS-1003 Rear Spar web and VS-1014L/R Spar Caps. Re-clecoed them back together and match drilled the holes in the flanges. Took apart and deburred the flange holes. Re-assembeld along with VS-1008...

View Details  

Replacement VS-1003 and (1) VS-1014

Hours:  2.3

Jan. 30, 2018

Replacement VS-1003 and (1) VS-1014 came today via Fedex. Cut the new VS-1014 to size and deburred both items. This time used the drill press to drill the match drilled holes in the VS-1003 web. Results were much better. Did...

View Details  

Drilling VS1003 and VS1014

Hours:  3.7

Jan. 20, 2018

First time Karrie has worked on the project! We cut and deburred the rear spar caps VS-1014 that I previously skipped. Grabbed the Dewalt drill, some cleco clamps, and started drilling per the manual. Ended up with some elongated holes...

View Details  

Begin Vertical Stab

Hours:  3.9

Jan. 13, 2018

Spent some time deburring parts and put some clecos in to see what its going to look like. Did not trim VS-1014-L/R per plans as I am waiting for confirmation from Vans that they were not damaged.

View Details