Date:Feb. 19, 2018

Hours:2.25

Brief Description:No safety wire holding the countersink cage lowered heat and made better holes.


Better result by checking each countersink prior to the next.

Match drilled and countersunk replacement VS-1008 VS spar doubler.  Also deburred all the adjoining holes that got the drill bit run through them while re-match drilling. Put the VS skeleton back together and ready to add the skin for match drilling.

  

Almost perfect according to https://www.vansaircraft.com/public/Specs.htm

Scrap VS-1008 doubler sitting on table next to new one clecoed in.