Date:May. 31, 2018
Hours:2.5
Brief Description:
After measuring about ten times I got the center punch and located the holes in the HS-1008L/R parts and drilled them per plans. I then mounted them on some scrap aluminum angle with a pair of C clamps and match drilled them to the front spar assembly. Next step was to match drill the rest of the holes common to the HS-1008L/R, HS-1002 Front Spar and HS-1007 Front Spar Doubler. I used a nifty “egg cup” drill bushing kit to keep the bit in the palm drill true to the material for the 3/16″ holes. This worked well. Countersunk the (8) holes in the HS-1007 and then match drilled the (18) #40 holes in the spar flanges followed by #40 countersink. Next step is to deburr holes and prime.