Date:Mar. 01, 2018
Hours:1.5
Brief Description:Use two people to roll the leading edges and it goes smooth!
Re-primed R-1012 counterbalance rib, squeezed the rivets for the R-1012 and used a “heavy duty” 1-1/4″ OD closet rod from Home Depot with a 7/8″ Husky socked bolted on one end. Mounted a ratchet in the socket and per the plans rolled one section at a time (from cut out to cutout). This worked well with two people.